BOT 830 & 824

  • Type of ProjectProvincial Roads
  • Location: Long An Province
  • Total Length24 Km
  • Value: USD 60m
  • Schedule: 2018
  • Project ParametersExpected collecting toll time is 19 years. 80km/h design speed and 12 tons maximum load
  • Type of Project: Provincial Roads
  • Total Length: 24 Km
  • Location: Long An Province
  • Status: Operating